Local service · Hainaut · postcode 7500

Provisional reception expert in Tournai

Are you building or buying new in Tournai or in Hainaut? Our real estate expert comes to you for the provisional reception. 14 sites already covered in Tournai since 2023.

Open interactive map →
Base d'expert · Tournai, Hainaut
110 km · 110 min from Wavre
MouscronAntoingPéruwelzLeuze-en-HainautEstaimpuis
Lead time
7 working days
Travel
Included
Receptions Tournai
14
Distance
110 km
Local rating
5.0 / 5
Particularités Tournai

Ce qu'on observe sur les chantiers à Tournai.

Tournai is one of the oldest cities in Belgium, famous for its Notre-Dame cathedral listed as a UNESCO World Heritage Site. The new-build market combines urban operations in the historic core (strong heritage constraints) and developments on the outskirts (Templeuve, Kain, Marquain). Our experts have been working there since 2023 on schist soils and with local contractors.

UNESCO heritage
Cathedral and belfry perimeter · facade, proportion, material constraints written into the permit.
Schist soils
Fractured schist substrate · vigilance for basement infiltration, PI study recommended.
Scheldt riverside
Scheldt banks · flood risk in low-lying areas, check hazard map and drainage of new properties.
Industrial redevelopment
Former Scheldt sites · possible Spaque certificate, check decontamination depending on the zone.
Cas concret · Feb. 2026

Recent assignment in Tournai: reception of a new-build house in Templeuve.

photo new-build house · Templeuve (Tournai)

Single-family home of 148 m² in a development in Templeuve, delivered by a Tournai contractor. Our expert identified 25 reservations in 4 hours, including basement infiltration (fractured schist soil) and an EPC non-compliance on ventilation.

The contradictory minutes enabled the owner to withhold €7,200 until full lifting. All corrected within 9 weeks by the contractor.

Client Tournai
★★★★★
« Finding an expert who knows Tournai schist soils and the UNESCO status was not easy. 25 reservations, €7,200 withheld, all settled in 9 weeks. »
FAQ Tournai

Frequently asked questions in Tournai

Do you operate throughout western Hainaut?
Yes — Tournai, Mouscron, Antoing, Péruwelz, Leuze, Comines and every municipality. Travel included, 7-day turnaround.
Timeframe for a reception in Tournai?
7 working days as standard given the distance (vs 5 elsewhere). No weekend or mileage surcharge.
UNESCO perimeter and cathedral?
For properties in the historic core, we check compliance with the UNESCO permit (facades, materials, proportions). Included in the service.
Schist soils and Scheldt?
We systematically check the PI study and the Scheldt flood hazard map for every new property in a low-lying area.

Need an expert in Tournai or in Hainaut?

Our expert intervenes within 7 working days in Tournai and the whole region. Travel included, fixed quote within 24 h.