★★★★★
Turnkey reception of a four-sided house in Wavre. We had had the file in hand for 18 months, the developer was pushing for a quick signature. The firm identified 34 reservations, 6 of them major (roof sealing, window thermal class, plumb defect in a load-bearing wall). The 5 % retention was legitimately blocked. After 3 months, everything was lifted and we moved in serenely. Without this support, we would have signed off that day — estimated future cost: €14,000.