Lead magnet · Free download

Final reception minutes template (PDF)

The final reception minutes are the act that officially closes your construction site, one year after the provisional reception. Our PDF covers the verification of lifted reservations, the release of the Breyne Law security deposit, and the triggers of the ten-year and two-year warranties.

✓Printable PDF
✓A4 format
✓10 pages
4.8 / 5
71 reviews
12 months
after provisional
Get the full pack
Receive the PDF minutes + notice in one email.
preview final reception minutes PDF
Preview · 10 pages in total
What's included

Everything to close your site properly.

  • 10-page final minutes template
    Validated structure: identity, site recap, control of provisional reservations, conclusion.
  • Reservations control grid
    Follow-up table of the provisional reservations: lifted / not lifted / partially lifted.
  • Security deposit release procedure
    Letter template to the notary to release the remaining 50% of the Breyne Law security deposit.
  • Warranty trigger notice
    When the two-year warranty (equipment 2 years) and the ten-year liability (10 years) run from the final minutes.
  • Signatures and retention memo
    Who signs, in how many copies, how to archive for the 10 years to come.
How to use it

Three steps to close your site.

01

Preparation · verification of lifted reservations

Go back to your provisional reception minutes and list the reservations recorded 12 months ago. For each one, find the lifting evidence: contractor invoices, before/after photos, validation emails. Identify reservations not or imperfectly lifted: they will be recorded in the final minutes and may justify the partial retention of the deposit balance.

02

Adversarial closing inspection · 1 to 2 h

Schedule an appointment with the contractor on site. Walk through the areas where reservations had been noted. Check the quality of the lifting: no residual defect, no new defect appeared. Also check the proper operation of equipment over 12 months of use (heating, sanitary, electrics, ventilation). Complete and sign the final minutes adversarially.

03

Deposit release and archiving

Send the signed final minutes to the notary (with, where applicable, mention of unlifted reservations and their costing). The notary will release the balance of the Breyne Law security deposit (5% blocked at signing). Carefully keep the minutes for at least 10 years (duration of ten-year liability). It is your only evidence in case of dispute over hidden defects discovered later.

Final reception minutes PDF pack

Receive the PDF minutes in one email.

Download now