Lead magnet · Free download

Provisional reception minutes template (printable PDF)

The PDF minutes our experts use on every site: 12 pages, court-compatible structure, examples of reservations costed by item (shell, finishes, equipment, exterior).

Printable PDF
A4 landscape format
12 pages
3,120
downloads
4.9 / 5
118 reviews
12
pre-filled sections
Get the full pack
Receive the PDF minutes + example in one email.
preview provisional reception minutes
Preview · 12 pages in total
What's included

The complete PDF minutes, ready to use on the day.

  • 12-page minutes template
    Structure validated by our legal counsel: identity, site, process, reservations, signatures, photo annexes.
  • Reservations grid by lot
    20 pre-defined items (roofing, façades, floors, sanitary, electrics, etc.) to tick and cost.
  • Anonymised example minutes
    Real minutes for a 168 m² turnkey home in Wavre, with 7 reservations costed totalling 4,800 €.
  • 4-page legal notice
    Article 1792 Civil Code, ten-year liability, two-year, perfect completion: what reception triggers.
  • Multi-signature book
    For multi-contractor contracts: separate sheet per lot with adversarial process tracked.
How to use it

Three steps to lead your provisional reception with the PDF minutes.

01

Day before reception · 30-min preparation

Print the minutes in 3 copies (you, the contractor, the architect if any). Prepare: draft deed, plans, specifications, photos of the ongoing site, laser measure, torch, camera. Also prepare a personal grid of points specific to your contract (tiles, custom finishes, optional equipment requested).

02

On the day · adversarial inspection 2 to 4 hours

Walk the property room by room with the contractor. For each non-conformity or defect, precisely note in the minutes: room, item, defect description, dimension/quantity, annotated photo. Estimate the cost or require the contractor's estimate. Have each page of the minutes counter-signed. At the end of the visit, total the reservations and set a lifting date together.

03

After reception · monitoring and lifting of reservations

Keep the signed original in your legal file. Send the contractor a copy by registered mail within 48 h to formally record. At each lifting, fill in a dated and photographed annex sheet. If the contractor does not lift the reservations within the set deadline (typically 60 to 90 days), you can activate the retention guarantee. Our notice details the complete procedure.

They used this template

More than 110 buyers used it in 2026.

★★★★★
« The minutes let me record 12 reservations including 3 major ones. My contractor fixed everything at his own expense. »
Vincent D. · Charleroi
★★★★★
« Ultra-clear structure, my contractor accepted it without complaint. We saved 2 h on the visit. »
Émilie R. · Mons
★★★★★
« Essential. Without these minutes, I would have missed a water-tightness defect at 6,000 €. »
Thomas H. · Liège
Provisional reception minutes PDF pack

Receive the PDF minutes in one email.

Download now