Expert firm · Breyne Law approved

Don't sign your reception without us.

Independent expert by your side on the day of the provisional reception. We identify defects and draft the minutes that protect your ten-year liability cover.

1,247
receptions delivered
96%
defects identified
4.9 / 5
187 Google reviews
12 years
field experience
Wallonia
+ Brussels Capital
Why an expert

You sign the minutes — your contractor signs the end of their liability.

A poorly prepared provisional reception costs you on average €4,200 in repairs during the first year. Our role: identify every reservation before you sign, and draft minutes that will hold up in court if needed.

01

Field expertise

Independent architects and civil engineers. No commercial link with your contractor — we work for you, not with them.

02

Legally binding minutes

Drafted in compliance with the Breyne Law. Every reservation is documented, photographed, geo-referenced. Admissible in court.

03

24h delivery guaranteed

Reception visit scheduled within 5 working days. Report delivered within 24h of the visit — service guarantee.

Our method

Four steps, zero bad surprises.

See all our services
STEP 01

Brief & quote

Describe your project in 3 fields. Detailed quote within 24h, based on property type and zone.

STEP 02

Documents pre-review

We audit your file: permit, specifications, plans, addendums. We note the points to verify on the day.

STEP 03

On-site reception

2 to 4 hours on site. Systematic inspection item by item. Photos, measurements, functional tests.

STEP 04

Minutes & follow-up

Minutes delivered within 24h. Follow-up of reservation lifting until the final reception (included).

Client testimonials

What the homeowners who trusted us have to say.

★★★★★ 4.9 / 5 · 187 verified reviews
★★★★★
« The expert identified 27 reservations I would never have spotted. My ten-year liability cover is intact, and the builder fixed everything at their cost. »
★★★★★
« A clear report with photographic evidence allowed me to withhold €8,500 from the balance until reservations were lifted. Essential. »
★★★★★
« I was worried about offending my contractor. In the end, the minutes clarified everything — he fixed it all without argument. »
Featured in
L'EchoTest-AchatsLa LibreRTBF InsideTrendsLe SoirVivre Ici
Service areas

Coverage across Wallonia + Brussels Capital.

Our experts are based in Wavre, Liège and Namur. Free travel up to 50 km. Beyond that, transparent mileage costs (€0.38/km).

Map of Wallonia and Brussels · 17 service areas · pins on Brussels, Wavre, Liège, Namur and 13 other principal cities © OpenStreetMap

Is your reception scheduled this month?

Pre-book your expert in 60 seconds. We'll call you back the same day with a slot and a detailed quote.