Interactive tool · 30 seconds
How much Breyne Law security deposit for your purchase?
Our calculator applies the Belgian legal rule: 5 % of the price excl. VAT of your home, blocked at the notary until the final reception. Enter your sale price, we compute the exact amount to set aside.
5 %
Breyne Law rule
Free
no email
Méthodologie
How is the calculation done?
The 5 % security deposit is imposed by article 12 of the Law of 9 July 1971 (Breyne Law). The calculation base is mandatorily the price excl. VAT — neither the price incl. VAT, nor the estimated cost of works. The amount is blocked at the notary (or via bank guarantee) until release in two stages: 50 % at the provisional reception, 50 % at the final one year later.
Variables du modèle
Living area pondération · 0.38
The larger the surface, the more the price excl. VAT rises proportionally.
Type of contractor pondération · 0.24
Turnkey vs architect carry different prices per m².
Delivery year pondération · 0.16
New-build prices have been rising since 2022 (+12 % on average).
Geographic area pondération · 0.12
Brussels +30 % vs Hainaut on the average price per m².
Standard / high-end finishes pondération · 0.1
Direct impact on the per-m² price agreed in the contract.
Cas pratiques
Three examples from our database.
Cas 01
New 95 m² apartment · Liège centre
Liège · centre
Estimé
15 200 €
Réel
15 250 €
Difference +0.3 % — estimate very close to the actual figure.
Cas 02
Turnkey 168 m² house · Wavre
Wavre · high-end finishes
Estimé
20 160 €
Réel
24 000 €
Difference +19 % — high-end finishes not anticipated in the estimate.
Cas 03
Architect 240 m² house · Namur
Namur · private architect
Estimé
33 600 €
Réel
38 200 €
Difference +14 % — land cost included in the contract.