Lead magnet · Free download

Provisional reception checklist: the 47 points to inspect

The exhaustive checklist used on provisional receptions. 47 points across 9 categories: shell, roof, façades, floors, walls, ceilings, sanitary, electrics, exterior. Printable in A4 landscape.

✓Printable PDF
✓A4 landscape format
✓6 pages
47
inspection points
Get the full pack
Receive the checklist + bonus in one email.
preview 47-point checklist
Preview · 6 pages in total
What's included

The complete checklist + its bonuses.

  • Printable 47-point checklist
    A4 landscape format, 6 pages, check-boxes, space for handwritten notes per point.
  • Visual guide of common defects
    8-page PDF with annotated photos of the 25 most frequent defects in new construction.
  • Reservation costing table
    Cost brackets (low / median / high) to quickly cost each defect type.
  • 2-page technical glossary
    Building terms explained so you can speak your contractor's language.
  • Pocket reminder
    Laminatable A6 card to slip into your pocket with the 10 critical points never to forget.
How to use it

Three steps to lead your inspection by the book.

01

The day before · materials and 30-min preparation

Print the checklist in A4 landscape (1 copy for you, 1 for the contractor). Prepare your kit: laser measure, spirit level, strong torch, camera (or smartphone), telescopic mirror for tricky areas, aluminium foil for draft tests, disposable gloves. Re-read your specifications to spot points specific to your contract.

02

On the day · systematic inspection 2 to 3 hours

Follow the checklist in the suggested order (exterior → interior → equipment). Tick each validated point, note anomalies in the margin with a numbered photo. For each defect: room, description, dimension, photo, cost estimate (your estimate serves as a negotiation baseline). Never skip a category even if it looks OK: a perfect floor can hide a laying defect visible only in grazing light.

03

After inspection · synthesis and transfer to the minutes

At the end of the inspection, count OK / KO / to-watch points. Transfer anomalies onto the official minutes (downloadable separately on our site). Have the checklist signed by the contractor in addition to the minutes: it is an extra piece of evidence useful in case of dispute over the completeness of the adversarial inspection.

47-point reception checklist pack

Receive the PDF checklist in one email.

Download now