Buyer's guide · new-build market · Liège Hesbaye

Buying a new-build apartment in Hannut: market, prices, districts (2026)

Hard data on the new-build apartment market in Hannut, districts where it pays to invest, active developers, local tax specifics and pitfalls at reception.

Sources: Statbel · Belgian Notaries · IWEPS · Q4 2024 data updated 05/2026
Hannut market snapshot
2 380 €/m²
Average new-build apartment price · Q4 2024
3-year change
+10%
Average absorption
11 months
New-build stock
220 units
3-year price trend

New-build apartment €/m² in Hannut rose +10% since 2022.

A small Hesbaye town, Hannut benefits from the E40 motorway (Liège 35 min, Brussels 50 min) and a sought-after peri-urban quality of life. New-build remains scarce but supply is densifying around the centre.

€/m² · new-build apartment · Hannut
2 160 €
2 250 €
2 330 €
2 380 €
2 460 €
2022
2023
2024
2025
2026 e.
Quartiers recommandés

Où acheter du neuf à Hannut en 2026 ? Notre lecture.

Hannut centre

Hannut-Centre

Premium
€2,520/m²
Commercial core, schools, services. Strong family demand.
Crehen Hannut

Crehen

Connected
€2,280/m²
Accessible section, E40 nearby. Good price/transport ratio.
Avernas Hannut

Avernas-le-Bauduin

Emerging
€2,200/m²
Small emerging new-build projects. Rural entry-level.
Wansin Hannut

Wansin

Residential
€2,400/m²
Residential section, schools, parks. Countryside setting.
Active developers

The 6 developers delivering new-build in Hannut in 2026.

Non-exhaustive list · factual information · we have no commercial ties with these players (deliberately so: our independence is our trade).

Developer
Flagship project
Type
Delivery
Developer Hannut Promotion
Flagship project Résidence du Marché
Type 22 apts
Delivery 2026-Q4
Developer Hesbaye Habitat
Flagship project Crehen Park
Type 18 apts
Delivery 2026-Q3
Developer Liège Construct
Flagship project Avernas Riverside
Type 14 apts
Delivery 2027-Q1
Developer Wansin Bâti
Flagship project Résidence Saint-Christophe
Type 16 apts
Delivery 2026-Q4
Developer BatiPro Wallonie
Flagship project Project Hannut Sud
Type 20 apts
Delivery 2026-Q3
Developer Wallonia Build
Flagship project Hesbaye Jardin
Type 12 apts
Delivery 2027-Q2
Local taxation

Hannut-specific premiums and incentives.

  • Walloon energy premium
    Up to €2,000 for heat pump + roof insulation (stackable depending on income).
  • Registration duty reduction
    Reduced 3% rate for EPC A and modest dwelling (≤ 200 m² habitable).
  • Wallonia tax shelter
    5-year income-tax reduction for new-build buy-to-let (€21,400 fiscal cap).
  • Wallonia renovation premium
    Stackable with regional aid for deep renovations — for VEFA conversions.
Hannut pitfall to avoid

Loamy subsoil and drainage.

Hesbaye sits on loamy soils with strong shrink-swell capacity. Drainage and peripheral waterproofing are decisive. Systematically require a G2 soil study, check the peripheral drainage system and basement watertightness at the reception record.

Témoignage acheteur
« The expert flagged a faulty drainage — fixed by the developer; we would have had infiltrations within 2 years. »
Portrait Bernard Detilleux, off-plan buyer in Hannut Bernard Detilleux · off-plan buyer · Hannut
From purchase to reception

Buying in Hannut?

Our reception expert service covers the entire Liège province. See the Hannut reception expert page →