Buyer's guide · new-build market · Liège Province

Buying a new-build house in Fayenbois: market, prices, advice (2026)

Hard data on the new-build house market in Fayenbois, residential hamlet of eastern Liège, active builders, regional taxation and pitfalls at reception.

Sources: Statbel · Belgian Notaries · IWEPS · Q4 2024 data updated 05/2026
Fayenbois market snapshot
2 480 €/m²
Average new-build house price · Q4 2024
3-year change
+11%
Average absorption
12 months
New-build stock
32 plots
3-year price trend

New-build house €/m² in Fayenbois rose +11% since 2022.

Fayenbois is a small village of the Beyne-Heusay municipality, in the second Liège ring. The market is deliberately contained (little land released); EPC-A and scarcity sustain a steady rise since 2022.

€/m² · new-build house · Fayenbois
2 230 €
2 330 €
2 420 €
2 480 €
2 560 €
2022
2023
2024
2025
2026 e.
Quartiers recommandés

Où acheter du neuf à Fayenbois en 2026 ? Notre lecture.

New-build house centre Fayenbois

Village centre

Premium
€2,580/m²
Main street and surroundings, village atmosphere, subdivisions rare.
New-build house Clos du Bois Fayenbois

Clos du Bois

Residential
€2,480/m²
Recent subdivision, 5-8 are plots, schools nearby in Beyne-Heusay.
New-build house route de Romsée Fayenbois

Route de Romsée

Connected
€2,420/m²
Arterial road, quick access to Liège centre, longer plots.
New-build house heights Fayenbois

Vue Vesdre

Emerging
€2,530/m²
Heights, open views, upper segment, 7-10 are plots.
Active builders

The 6 builders delivering new-build houses in Fayenbois in 2026.

Non-exhaustive list · factual information · we have no commercial ties with these players (deliberately so: our independence is our trade).

Builder
Flagship project
Type
Delivery
Builder Maisons Marc Goffin
Flagship project Clos du Bois Fayenbois
Type 6 houses
Delivery 2026-Q3
Builder Mosa Habitat
Flagship project Lotissement Beyne-Heusay
Type 8 houses
Delivery 2026-Q4
Builder Trabel Habitat
Flagship project Hameau de Romsée
Type 5 houses
Delivery 2027-Q1
Builder Bati Liège
Flagship project Domaine Vesdre Hauteurs
Type 7 houses
Delivery 2026-Q4
Builder Compaan Construction
Flagship project Résidence Fayenbois Nord
Type 4 houses
Delivery 2026-Q2
Builder Habitat Wallonia
Flagship project Clos des Chênes
Type 6 houses
Delivery 2026-Q3
Local taxation

Liège region-specific premiums and incentives.

  • New-build premium EPC-A
    Up to €2,500 for heat pump + photovoltaic + enhanced insulation (Wallonia + Beyne-Heusay municipal bonus).
  • Registration duty reduction
    Reduced rate to 3% on EPC A and modest housing (≤ 200 m² habitable).
  • Wallonia tax shelter
    Income-tax reduction over 5 years for new-build buy-to-let (€21,400 fiscal cap).
  • EPC renovation premium
    Stackable with regional aid for deep transformation — useful in evolving VEFA.
Fayenbois pitfall to avoid

Foundations on silty soil and former galleries.

The subsoil of the eastern Liège ring is silty to clay, and retains former coal-mining galleries (Beyne-Heusay / Fléron region). Demand a G2 soil study and consultation of the Walloon mining cadastre before signing. Check drainage, footings and perimeter waterproofing at reception.

Témoignage acheteur
« Our builder hadn't planned site drainage. The expert had it redone before the reception record — saved €5,600. »
Portrait Olivier Renard, owner in Fayenbois Olivier Renard · new-build house owner · Fayenbois
From purchase to reception

Buying in Fayenbois? We support you on reception day.

Our reception expert service covers all of Liège province. See the Fayenbois reception expert page →