Buyer's guide · new-build market · Liège Province

Buying a new-build house in Liège: market, prices, districts (2026)

Hard data on the new-build house market in the city of Liège, districts where to invest, active builders, regional taxation and pitfalls at reception.

Sources: Statbel · Belgian Notaries · IWEPS · Q4 2024 data updated 05/2026
Liège market snapshot
2 650 €/m²
Average new-build house price · Q4 2024
3-year change
+12%
Average absorption
12 months
New-build stock
320 plots
3-year price trend

New-build house €/m² in Liège rose +12% since 2022.

New-build houses in Liège remain an intermediate segment — less rare than in Brussels but tighter than in the second ring. Pressure on outskirts (Rocourt, Cointe, Wandre) drives the rise, with EPC-A and material costs as support.

€/m² · new-build house · Liège
2 370 €
2 490 €
2 590 €
2 650 €
2 740 €
2022
2023
2024
2025
2026 e.
Quartiers recommandés

Où acheter du neuf à Liège en 2026 ? Notre lecture.

New-build house Cointe Liège

Cointe

Premium
€2,920/m²
Residential heights, views over Liège, 6-12 are plots, upper segment.
New-build house Rocourt

Rocourt

Connected
€2,680/m²
Northern commercial hub, recent subdivisions, schools nearby.
New-build house Wandre

Wandre

Residential
€2,480/m²
Right-bank village, calm and greenery, direct E40 access.
New-build house Angleur

Angleur

Emerging
€2,580/m²
Close to Sart Tilman/ULiège, strong student rental demand.
Active builders

The 8 builders delivering new-build houses in Liège in 2026.

Non-exhaustive list · factual information · we have no commercial ties with these players (deliberately so: our independence is our trade).

Builder
Flagship project
Type
Delivery
Builder Maisons Marc Goffin
Flagship project Domaine Cointe Hauteurs
Type 10 houses
Delivery 2026-Q3
Builder Mosa Habitat
Flagship project Lotissement Rocourt Nord
Type 14 houses
Delivery 2026-Q4
Builder Trabel Habitat
Flagship project Hameau de Wandre
Type 8 houses
Delivery 2027-Q1
Builder Bati Liège
Flagship project Clos d'Angleur
Type 12 houses
Delivery 2026-Q4
Builder Compaan Construction
Flagship project Résidence Sclessin Sud
Type 9 houses
Delivery 2026-Q2
Builder Logis Liégeois
Flagship project Villas Outremeuse
Type 6 houses
Delivery 2026-Q3
Builder Habitat Wallonia
Flagship project Domaine de Grivegnée
Type 11 houses
Delivery 2027-Q2
Builder Atlantis Promo
Flagship project Projet Sart-Tilman
Type 8 houses
Delivery 2026-Q4
Local taxation

Liège-specific premiums and incentives.

  • New-build premium EPC-A
    Up to €2,500 for heat pump + photovoltaic + enhanced insulation (Wallonia + Liège municipal bonus).
  • Registration duty reduction
    Reduced rate to 3% on EPC A and modest housing (≤ 200 m² habitable).
  • Wallonia tax shelter
    Income-tax reduction over 5 years for new-build buy-to-let (€21,400 fiscal cap).
  • EPC renovation premium
    Stackable with regional aid for deep transformation — useful in evolving VEFA.
Liège pitfall to avoid

Meuse-side foundations and mining galleries.

Liège combines two major risks: high water tables in the valley floor (Outremeuse, Sclessin, Wandre right bank) and mining galleries under the heights (Cointe, Grivegnée, Saint-Léonard). Imperatively demand a G2 soil study and consult the Walloon mining cadastre before deed of sale. Drainage, reinforced foundations and waterproofing to verify at reception.

Témoignage acheteur
« We discovered through the audit that a load-bearing wall was not plan-compliant. Full rework demanded — saved €11,200. »
Portrait Romain Hubin, owner in Liège Romain Hubin · new-build house owner · Liège
From purchase to reception

Buying in Liège? We support you on reception day.

Our reception expert service covers all of Liège province. See the Liège reception expert page →