Calculating price and taxation of a Belgian new-build purchase
Comprehensive guide · 10 related articles · updated on 27 May 2026

Price and taxation of Belgian new-build property: 2026 guide

Belgian new-build pricing: 21% VAT, registration duty, bonuses, EPC, notary fees, regional comparison. The complete 2026 tax guide.

📖 1,708 words · ≈ 16 min read Reviewed by Me. Verbist, construction lawyer

Understanding the price of a Belgian new-build

The price of a Belgian new-build always consists of five blocks: land cost, works cost (shell, second fix, equipment, finishes), developer or contractor margin, financial costs (interim interest, guarantees, insurance) and taxation (21% VAT, registration duties on the land share, notary fees). These five blocks vary strongly from region to region — a new-build apartment in Brussels does not arbitrate like a turnkey house in Luxembourg Province.

According to official Statbel statistics on property prices, the following indicative ranges are observed in 2026 for new-build in French-speaking Belgium:

  • EPC A new-build apartment, 70-90 m², Brussels: €4,200 to €5,600 incl. VAT/m²
  • EPC A new-build apartment, 70-90 m², Liège or Namur: €3,100 to €3,900 incl. VAT/m²
  • EPC A turnkey house, 150-180 m², Walloon Brabant: €1,800 to €2,400 excl. VAT/m² construction (land excluded)
  • EPC A turnkey house, 150-180 m², Hainaut or Liège: €1,500 to €2,000 excl. VAT/m²

The land cost is added to these amounts: €200 to €800/m² in Wallonia depending on municipality, €600 to €1,500/m² in Brussels periphery, €800 to €2,500/m² in city centre.

21% VAT on new construction

21% VAT is the dominant taxation of Belgian new-build property. It replaces registration duty (12.5% in Wallonia/Brussels, 12% in Flanders) that applies to older property.

Scope. 21% VAT applies to:

  • Sale of a new-build home by a taxable person (developer), as long as it has not been occupied more than 2 years
  • New construction works carried out by a contractor
  • Heavy renovations equivalent to new construction (rebuild of the shell)

Calculation. On a €320,000 excl. VAT apartment, VAT amounts to €67,200, i.e. an incl. VAT price of €387,200. This is the calculation base for your contribution and your mortgage.

Land exception in turnkey. When you buy land then have it built (turnkey), the land remains subject to registration duty (12.5% in Wallonia/Brussels), while the construction is subject to 21% VAT. You therefore pay both taxes on two distinct bases.

To dig deeper: 21% construction VAT, New-build VAT.

6% VAT: for whom, under what conditions?

6% VAT exists alongside 21% VAT, but it primarily targets renovation and certain temporary regimes.

Permanent regime — Renovation of homes > 10 years. Cumulative conditions:

  1. Property for private residential use
  2. Home over 10 years old at invoicing
  3. Invoiced by a registered contractor with the VAT administration

This regime does not concern new construction proper — it was created to support renovation of the existing stock.

Temporary demolition-reconstruction regime. From 2021 to 2024, a 6% VAT regime applied to demolition of an old property followed by reconstruction in certain Belgian cities, under strict conditions (personal occupation, area limited to 200 m²). This regime was restricted in 2025 and replaced by targeted measures. Check with your notary the conditions in force on your purchase date.

Detailed cluster: 6% VAT conditions.

Notary fees and mortgage guarantee

On top of the excl. VAT price and VAT, two cost items are systematically added to your new-build purchase budget.

Notary fees. For a new-build sale deed, the notary’s fees are set by Royal Decree and calculated as a degressive percentage of the sale price — you can obtain an exact estimate via the official Notaire.be purchase cost calculators:

  • Base fees: about 0.8 to 1.4% of the price
  • Fiscal distribution rights and administrative fees: 0.3 to 0.6%
  • Average total: between 1% and 2% of the sale price

For a €350,000 incl. VAT apartment, notary fees revolve around €4,200 to €6,500.

Mortgage guarantee. When you borrow with a mortgage, the bank requires real security: mortgage registration (fees set at about 1.3 to 1.5% of the loan amount, plus notary fees on the guarantee) or mortgage mandate (about 0.5 to 0.8% but with risk for the bank, hence sometimes higher interest rate).

For a €280,000 loan, mortgage registration costs about €4,200 to €5,800 in initial fees.

Cluster: New-build notary fees and New-build apartment purchase fees.

“A new-build buyer must budget between 5 and 8% of additional costs on top of the excl. VAT price: VAT itself is already included in the advertised price, but notary fees, mortgage guarantee and file fees are added.”

Notaire.be, practical guide 2026

Regional bonuses and incentives

Energy bonuses and regional tax incentives can significantly reduce the total cost of a new-build purchase. Each region has its own scheme.

Wallonia. The scheme was restructured in 2024-2025 around EPC and updated scales are published on the official Walloon Region energy and renovation bonus portal:

  • EPC A+ bonus: up to €4,500 for very low energy new-builds
  • Q-ZEN / passive bonus: strict conditions, amount tied to performance
  • Photovoltaic panels bonus: flat rate per kWc installed
  • Chèque Habitat: annual tax reduction up to €1,520 for 25 years for first-time buyers
  • Zero-rate loans Société wallonne du Crédit social: for modest incomes

Brussels. RENOLUTION programme and acquisition bonuses, whose eligibility and steps are detailed on the Bruxelles Environnement Bonuses & Incentives portal:

  • Low-energy new-build acquisition bonus under income conditions
  • RENOLUTION bonuses for heavy renovation
  • Registration duty reduction under income and personal occupation conditions

Flanders. Regional schemes: Vlaamse Woonlening, Mijn VerbouwLening for renovation, EPC bonuses.

See our pages Brussels construction bonus and Wallonia new-build bonus.

Free tool · calculator
Calculate your new-build purchase costs in 60 seconds
21% VAT, notary fees, mortgage guarantee, bonuses: our calculator estimates your total budget based on your profile and region.
Start calculation

Impact of EPC on price and resale value

Since EPC mention has been mandatory in listings (Wallonia since 2010, Brussels since 2011, Flanders since 2008) and requirements were tightened in 2024, EPC has become a major determinant of Belgian property prices.

EPC A+ premium. A new-build EPC A+ apartment sells on average 8 to 12% more per m² than an equivalent EPC C, at comparable location. The build premium (4 to 8% additional costs) is thus offset by the resale premium.

Discount on mediocre EPC. For new-build, rarely an issue (EPC A or B mandatory). For comparable older property, a 10 to 20% discount weighs on EPC E or F in certain tight zones (Brussels mainly).

Energy costs. An EPC A typically consumes 30 to 60 kWh/m²/year, against 150 to 250 kWh/m²/year for an EPC E. Over 25 years, the saving represents several tens of thousands of euros.

Regional price comparison: Brussels, Wallonia, Flanders

Brussels-Capital. Tight market, scarce land. New-build 80 m² apartment: €340,000 to €480,000 incl. VAT depending on municipality (Watermael-Boitsfort, Ixelles, Uccle at top range; Anderlecht, Molenbeek at bottom).

Walloon Brabant. Premium market, strong demand from Brussels executives. 180 m² turnkey house: €480,000 to €720,000 incl. VAT (Waterloo, Lasne, Rixensart at top; Genappe, Perwez at bottom).

Liège Province. More accessible market. New-build 150 m² house: €310,000 to €460,000 incl. VAT (Liège, Herstal, Seraing in median zone; small rural municipalities at bottom).

Namur Province. Intermediate market. 160 m² house: €320,000 to €480,000 incl. VAT.

Hainaut. The most accessible in Wallonia. 150 m² house: €240,000 to €380,000 incl. VAT (Mons, Tournai, Charleroi in median zone).

Luxembourg Province. Specific market, Luxembourgish influence on the Arlon area. 160 m² house: €280,000 to €460,000 incl. VAT (Arlon, Bastogne at top).

Average new-build price per zone (Wallonia + Brussels · 2026)
Zone
Min
Médiane
Max
Brussels-Capital Ixelles · Uccle · centre
4 200
5 100
6 800
Walloon Brabant (Waterloo, Lasne) Premium residential WB
3 500
4 200
5 400
Walloon Brabant (Wavre, OLLN) Tight market, students
3 000
3 500
4 200
Liège province (city) University hub
2 700
3 200
3 800
Namur province (city)
2 600
3 000
3 600
Hainaut (Mons, Tournai)
2 300
2 700
3 200
Hainaut (Charleroi, La Louvière) More accessible · reconversion
1 900
2 300
2 800
Luxembourg province (Arlon) Luxembourg influence
2 400
2 900
3 400
Plus accessible Moyen Élevé Premium · €/m²

Firm estimates 2026 · T2-T3 new-build apartments. 21% VAT included. Sources: observed contracts + Statbel indices + STATEC cross-border.

Tax strategy: optimising your purchase

Some optimisation paths, to validate with your notary and a tax advisor:

  1. Buy as a couple rather than solo: double Chèque Habitat possible in Wallonia under conditions, doubled thresholds.

  2. Check eligibility for regional bonuses from the compromise phase. Some bonuses require prior steps (energy audit, project submission).

  3. Compare mandate vs mortgage registration: the mandate costs less but the bank may raise the rate. Calculation to make case by case.

  4. Monitor temporary schemes (6% VAT demolition-reconstruction, one-off bonuses). They can represent several tens of thousands of euros in savings.

Conclusion

The taxation of Belgian new-build property is dense but coherent: 21% VAT replacing registration duty, modest notary fees, incompressible mortgage guarantee, potential regional bonuses. The key is to reason in total cost (excl. VAT + VAT + costs + guarantees minus bonuses) rather than advertised price.

For buyers committing to 25 years and several hundred thousand euros, support by a specialised notary and an independent construction expert is not a luxury — it is the assurance of not getting the calculation, contract or warranties wrong.

Questions fréquentes

Les 6 questions qu'on nous pose le plus.

Une question qui n'est pas listée ? On vous répond en 24h.

Why is VAT 21% on new-build and not 12.5% as in older property?
Because the sale of a new-build property is legally equated with a supply of goods within the meaning of the European VAT directive, not a real-estate transfer under regional tax law. The 21% VAT therefore replaces registration duties (12.5% in Wallonia/Brussels, 12% in Flanders) for properties sold within 2 years of first occupation. For a €300,000 excl. VAT apartment, VAT amounts to €63,000 versus €37,500 of registration duty in older property.
What costs are added to the new-build purchase price?
Five cost items are added to the excl. VAT price: (1) 21% VAT on the construction; (2) 12.5% registration duty on the land share in turnkey (in Wallonia/Brussels); (3) notary fees (1 to 2% of the price depending on the deed type); (4) mortgage guarantee (1.3 to 2% of the loan amount); (5) bank file fees (€350 to €750). In total, count 5 to 8% additional costs on top of the excl. VAT price.
Is there a 6% reduced VAT for new construction?
Not for new-build proper. The 6% VAT exists for renovation of homes over 10 years old, under 3 cumulative conditions: (1) private residential property, (2) home over 10 years old, (3) invoiced by a registered contractor. For demolition-reconstruction, a temporary 6% VAT regime existed until 31 December 2024 in certain Belgian cities but was restricted in 2025. Check current provisions with your notary.
What energy bonuses for new construction in Wallonia?
Since 2024, the Walloon energy bonus regime for new construction has been restructured. Main aids: EPC A+ bonus (up to €4,500), EPC Q-Zen bonus (passive), photovoltaic panels bonus (per kWc installed), Chèque Habitat (annual tax reduction up to €1,520 for first-time buyers). Conditions and amounts evolve yearly; consult energie.wallonie.be. See our page Wallonia bonuses.
Are Belgian new-build prices still rising in 2026?
According to Belgian notaries (Notaire.be, Q4 2025 Barometer), the average price of a Belgian new-build apartment rose +3.2% in 2025 and the trend continues in 2026 (+2 to +4% expected). Rises are sharper on EPC A+ properties and tight zones (Brussels, Walloon Brabant, periphery of Liège and Namur). **Construction costs** themselves rose +5 to +8% over 2 years, especially on insulation and HVAC techniques.
How to finance a new-build purchase with a mortgage?
The Belgian mortgage for a new-build follows standard rules: 80-90% of the price max (NBB recommends 90%), 20-25 year term, fixed or variable rate. New-build specifics: the bank may require release in instalments aligned with fund calls (Article 7 Breyne Law), with interim interest during construction. Count 0.5 to 1% additional interest on this phase. See construction mortgage.

Need help with price and taxation of belgian new-build property: 2026 guide?

Our firm supports you on all technical and legal aspects. Quote within 24 hours.