Buyer's guide · new-build market · Walloon Brabant Province

New construction in Walloon Brabant: market, prices, advice (2026)

Complete overview of new construction in Walloon Brabant — turnkey houses, off-plan apartments, subdivisions and serviced residences — municipalities, developers, regional taxation and pitfalls at reception.

Sources: Statbel · Belgian Notaries · IWEPS · Q4 2024 data updated 05/2026
Walloon Brabant market snapshot
3 050 €/m²
Average all new construction price · Q4 2024
3-year change
+13%
Average absorption
12 months
New-build stock
1,480 units
3-year price trend

New-build €/m² in WB rose +13% since 2022.

All segments combined (houses, apartments, subdivisions, serviced residences), the province is the most expensive in Wallonia. Proximity to Brussels, land pressure in Wavre-Ottignies-Waterloo and the mandatory EPC-A keep the upward trend going.

€/m² · all new construction · WB
2 700 €
2 870 €
2 990 €
3 050 €
3 150 €
2022
2023
2024
2025
2026 e.
Quartiers recommandés

Où acheter du neuf à Walloon Brabant en 2026 ? Notre lecture.

New construction Wavre Walloon Brabant

Wavre

Premium
€3,120/m²
Provincial capital, mix of houses and apartments, active tertiary employment basin.
New construction Ottignies-Louvain-la-Neuve

Ottignies-LLN

Connected
€3,340/m²
University town, student residences and dynamic family subdivisions.
New construction Waterloo

Waterloo

Residential
€3,480/m²
Upmarket residential, houses and EPC A+ apartments, premium segment.
New construction Nivelles

Nivelles

Emerging
€2,780/m²
Southern WB, balanced mix, affordable new-build projects, IC station.
Active developers and builders

The 8 players delivering new-build in Walloon Brabant in 2026.

Non-exhaustive list · factual information · we have no commercial ties with these players (deliberately so: our independence is our trade).

Developer / builder
Flagship project
Type
Delivery
Developer / builder Atenor Brabant
Flagship project Résidence Wavre Park
Type 60 apts
Delivery 2026-Q3
Developer / builder Immobel Residential
Flagship project Domaine Ottignies Nord
Type 45 apts
Delivery 2026-Q4
Developer / builder BPI Real Estate
Flagship project Clos Waterloo Hauteurs
Type 32 houses
Delivery 2027-Q1
Developer / builder Maisons Marc Goffin
Flagship project Lotissement Nivelles Sud
Type 24 houses
Delivery 2026-Q4
Developer / builder Trabel Habitat
Flagship project Domaine de Lasne
Type 18 houses
Delivery 2026-Q2
Developer / builder BW Construct
Flagship project Résidence LLN Étudiants
Type 80 units
Delivery 2027-Q2
Developer / builder Bati Brabant
Flagship project Domaine Court-Saint-Étienne
Type 20 houses
Delivery 2026-Q3
Developer / builder Habitat Wallonia
Flagship project Projet Tubize Verte
Type 28 units
Delivery 2026-Q4
Local taxation

Specific premiums and incentives in Walloon Brabant.

  • EPC-A new-construction premium
    Up to €2,500 for heat pump + photovoltaic + reinforced insulation (Wallonia + variable municipal bonuses).
  • Registration duty reduction
    Reduced 3% rate on EPC A and modest housing (≤ 200 m² liveable).
  • Wallonia tax shelter
    Five-year income-tax reduction for new-build buy-to-let (€21,400 fiscal cap).
  • EPC renovation premium
    Stackable with regional aid for deep transformation — useful in evolving VEFA.
Walloon Brabant pitfall to avoid

Clay soils of the Brabant plateau.

On the southern half of WB (Genappe, Court-Saint-Étienne, Chastre, Villers-la-Ville), swelling clay soils cause cracks and deformations within 5 to 10 years if foundations are undersized. Systematically demand a G2 soil survey — applicable to houses, apartments and subdivisions. Verify the raft slab or reinforced footings and the perimeter drainage at reception.

Témoignage acheteur
« We were sold an 'EPC A' apartment that had never been tested. The expert had it retested — the final certificate came through. »
Portrait Caroline Verhulst, owner in Walloon Brabant Caroline Verhulst · new-build apartment owner · Wavre
From purchase to reception

Buying new-build in WB? We support you on reception day.

Our reception expert service covers all of Walloon Brabant, houses and apartments. See the Walloon Brabant reception expert page →