Pre-completion of a new house: practical guide

photo auteur
By Edouard Hennin, Pre-completion expert
Published on 27 May 2026 Updated on 27 May 2026 7 min read

The pre-completion of a new turnkey house requires a method suited to the typical risks of this type of construction.

1. When?

10 to 15 days before the planned date of the provisional reception. This leaves the contractor time to correct.

2. Sensitive points

  • Watertightness of the roof (a rain test is ideal)
  • Water/gas/electricity connections
  • G1 certificate available
  • Final EPC compliance
  • Exterior finishings (terrace, surroundings)

3. With or without an expert?

The expert brings a neutral eye, a testing protocol, and credibility before the contractor. Often profitable from the first significant reservation onwards.

New house pre-completion expert.

Common questions

When to schedule the pre-completion?
10 to 15 days before the planned provisional reception date.
What does it cost with an expert?
Expect €350 to €600 for a visit plus report.