Buyer's guide · new-build market · Namur Province

Buying a new-build apartment in Namur: market, prices, districts (2026)

Hard data on the new-build apartment market in Namur, districts where it pays to invest, active developers, local tax specifics and pitfalls at reception.

Sources: Statbel · Belgian Notaries · IWEPS · Q4 2024 data updated 05/2026
Namur market snapshot
2 680 €/m²
Average new-build apartment price · Q4 2024
3-year change
+12.0%
Average absorption
10 months
New-build stock
890 units
3-year price trend

New-build apartment €/m² in Namur rose +12.0% since 2022.

As the Walloon capital, Namur stacks every advantage: seat of the Walloon Parliament and Government, university city (UNamur), UNESCO heritage. Land pressure remains strong and the Sambre/Meuse confluence centre reaches premium prices. Jambes and Salzinnes are the rational alternatives.

€/m² · new-build apartment · Namur
2 390 €
2 510 €
2 620 €
2 680 €
2 770 €
2022
2023
2024
2025
2026 e.
Quartiers recommandés

Où acheter du neuf à Namur en 2026 ? Notre lecture.

Namur centre Corbeau

Centre / Corbeau

Premium
€3,080/m²
Pedestrianised heart under the Citadel. Strong student and expat rental demand.
Jambes Namur

Jambes

Residential
€2,590/m²
Right bank, Meuse view, balanced neighbourhood life. Large new-build pipeline.
Salzinnes Namur

Salzinnes

Emerging
€2,380/m²
Transforming district behind the station. Good price/centre ratio.
Bouge Namur

Bouge

Connected
€2,480/m²
Residential plateau. Connected to E411 and RER.
Active developers

The 8 developers delivering new-build in Namur in 2026.

Non-exhaustive list · factual information · we have no commercial ties with these players (deliberately so: our independence is our trade).

Developer
Flagship project
Type
Delivery
Developer Thomas & Piron
Flagship project Confluence Meuse
Type 85 apts
Delivery 2026-Q4
Developer BPI Real Estate
Flagship project Les Jardins de la Citadelle
Type 42 apts
Delivery 2026-Q3
Developer Matexi Wallonie
Flagship project Jambes Riverside
Type 60 apts
Delivery 2027-Q1
Developer Eckelmans
Flagship project Salzinnes Centre Gare
Type 48 apts
Delivery 2026-Q4
Developer Cocoon Construction
Flagship project Bouge Vert Plateau
Type 26 apts
Delivery 2026-Q2
Developer Equilis
Flagship project Project Hastedon
Type 120 apts
Delivery 2027-Q3
Developer Logis Namurois
Flagship project Villa Saint-Servais
Type 22 apts
Delivery 2026-Q3
Developer Capelli Belgique
Flagship project Corbeau Lofts
Type 30 apts
Delivery 2027-Q1
Local taxation

Namur-specific premiums and incentives.

  • Municipal energy premium
    Up to €2,000 for heat pump + roof insulation (stackable with Walloon regional aid).
  • Registration duty reduction
    Reduced rate of 3% on EPC A and modest housing (≤ 200 m² liveable).
  • Wallonia tax shelter
    Income-tax reduction over 5 years for new-build buy-to-let investment (€21,400 fiscal cap).
  • Heritage renovation premium
    Specific to UNESCO/Citadel perimeter: 25% uplift for deep renovation.
Namur pitfall to avoid

Confluence humidity and flood-prone basements.

The confluence districts (Corbeau, lower Salzinnes, Joghiers quay) experienced floods in 2021. Check the PPRI (flood risk prevention plan) and demand details of basement and parking protection devices before signing.

Témoignage acheteur
« Buying in Namur after the floods was stressful. Their expert's report reassured me room by room. »
Portrait Mathilde Lambotte, off-plan buyer in Jambes Mathilde Lambotte · off-plan buyer · Jambes
From purchase to reception

Buying in Namur? We support you on reception day.

Our reception expert service covers the entire Namur Province. See the Namur reception expert page →