Buyer's guide · new-build market · Namur Province

Buying a new-build house in Le Roux: market, prices, advice (2026)

Hard data on the new-build house market in Le Roux, village of the Fosses-la-Ville municipality, active builders, regional taxation and pitfalls at reception.

Sources: Statbel · Belgian Notaries · IWEPS · Q4 2024 data updated 05/2026
Le Roux market snapshot
2 480 €/m²
Average new-build house price · Q4 2024
3-year change
+11%
Average absorption
13 months
New-build stock
28 plots
3-year price trend

New-build house €/m² in Le Roux rose +11% since 2022.

Le Roux is a residential village of the Fosses-la-Ville municipality, in Namur province. The market is constrained here (28 plots end-2024) and driven by buyer overflow from Namur centre, now more expensive. EPC-A sustains the dynamic.

€/m² · new-build house · Le Roux
2 230 €
2 330 €
2 420 €
2 480 €
2 560 €
2022
2023
2024
2025
2026 e.
Quartiers recommandés

Où acheter du neuf à Le Roux en 2026 ? Notre lecture.

New-build house centre Le Roux

Village centre

Premium
€2,580/m²
Main street, church square, preserved village atmosphere.
New-build house Clos des Champs Le Roux

Clos des Champs

Residential
€2,480/m²
Recent subdivision, 6-10 are plots, open views.
New-build house Aiseau exit Le Roux

Aiseau exit

Connected
€2,380/m²
Near E42, fast access Charleroi and Namur, longer plots.
New-build house heights Le Roux

Vue Sambre

Emerging
€2,450/m²
Heights with valley views, 8-12 are plots, upper segment.
Active builders

The 6 builders delivering new-build houses in Le Roux in 2026.

Non-exhaustive list · factual information · we have no commercial ties with these players (deliberately so: our independence is our trade).

Builder
Flagship project
Type
Delivery
Builder Maisons Marc Goffin
Flagship project Clos des Champs Le Roux
Type 6 houses
Delivery 2026-Q3
Builder Trabel Habitat
Flagship project Hameau Sambre
Type 5 houses
Delivery 2026-Q4
Builder Compaan Construction
Flagship project Lotissement Aiseau
Type 8 houses
Delivery 2027-Q1
Builder Maisons Baijot
Flagship project Domaine du Bois
Type 7 houses
Delivery 2026-Q4
Builder Habitat Namurois
Flagship project Résidence Le Roux
Type 4 houses
Delivery 2026-Q2
Builder Bati Namur
Flagship project Clos des Tilleuls
Type 6 houses
Delivery 2026-Q3
Local taxation

Namur province-specific premiums and incentives.

  • New-build premium EPC-A
    Up to €2,500 for heat pump + photovoltaic + enhanced insulation (Wallonia).
  • Registration duty reduction
    Reduced rate to 3% on EPC A and modest housing (≤ 200 m² habitable).
  • Wallonia tax shelter
    Income-tax reduction over 5 years for new-build buy-to-let (€21,400 fiscal cap).
  • EPC renovation premium
    Stackable with regional aid for deep transformation — useful in evolving VEFA.
Le Roux pitfall to avoid

Clay soils and former iron mines.

The Sambre valley saw iron and blue-stone extraction activity until the early 20th century. Clay to clay-silt soils dominate. Demand a G2 soil study before deed and consult the Walloon mining cadastre. Reinforced foundations and drainage to verify at reception.

Témoignage acheteur
« The builder tried to push through remedials. The expert held firm — everything was corrected before signing. »
Portrait Aurore Mathieu, owner in Le Roux Aurore Mathieu · new-build house owner · Le Roux
From purchase to reception

Buying in Le Roux? We support you on reception day.

Our reception expert service covers all of Namur province. See the Le Roux reception expert page →