Buyer's guide · new-build market · Namur Province

New construction in Namur Province: market, prices, advice (2026)

Complete overview of new construction in Namur Province — off-plan apartments in the Walloon capital, turnkey houses in the ring, rural subdivisions in Condroz and Famenne — developers, regional taxation and pitfalls.

Sources: Statbel · Belgian Notaries · IWEPS · Q4 2024 data updated 05/2026
Namur Province market snapshot
2 650 €/m²
Average all new construction price · Q4 2024
3-year change
+12%
Average absorption
11 months
New-build stock
1,320 units
3-year price trend

New-build €/m² in Namur Province rose +12% since 2022.

The Walloon capital drives the entire province. Institutional presence, tourist appeal, spillover from a now-unaffordable WB: absorption is the fastest in Wallonia (11 months). EPC-A and material costs reinforce a steadily upward trend.

€/m² · all new construction · Namur Province
2 370 €
2 490 €
2 580 €
2 650 €
2 740 €
2022
2023
2024
2025
2026 e.
Quartiers recommandés

Où acheter du neuf à Namur en 2026 ? Notre lecture.

New construction Namur

Namur

Premium
€2,850/m²
Walloon capital, large off-plan volume, IC station, institutions, student demand.
New construction Gembloux

Gembloux

Connected
€2,680/m²
Northern WB-Namur, IC station to Brussels, residential subdivisions and apartments.
New construction Dinant

Dinant

Emerging
€2,380/m²
Southern Meuse valley, residential and tourist mix, E411 accessibility.
New construction Andenne

Andenne

Residential
€2,420/m²
Meuse right bank, new-build subdivisions and serviced residences.
Active developers and builders

The 8 major players delivering new-build in Namur Province in 2026.

Non-exhaustive list · factual information · we have no commercial ties with these players (deliberately so: our independence is our trade).

Developer / builder
Flagship project
Type
Delivery
Developer / builder Bati Namur
Flagship project Projet Namur Capitale
Type 85 apts
Delivery 2026-Q4
Developer / builder Maisons Marc Goffin
Flagship project Lotissement Jambes Hauteurs
Type 18 houses
Delivery 2026-Q3
Developer / builder Trabel Habitat
Flagship project Domaine de Bouge
Type 12 houses
Delivery 2026-Q4
Developer / builder Compaan Construction
Flagship project Clos de Wépion
Type 16 houses
Delivery 2027-Q1
Developer / builder Atenor Namur
Flagship project Résidence Gare-Confluent
Type 60 apts
Delivery 2027-Q2
Developer / builder Habitat Namurois
Flagship project Clos des Vignes Dinant
Type 14 houses
Delivery 2026-Q3
Developer / builder BatiPro Wallonie
Flagship project Andenne Riverside
Type 40 apts
Delivery 2026-Q4
Developer / builder Tradiczek Namur
Flagship project Domaine Gembloux Nord
Type 22 units
Delivery 2026-Q2
Local taxation

Specific premiums and incentives in Namur Province.

  • EPC-A new-construction premium
    Up to €2,500 for heat pump + photovoltaic + reinforced insulation (Wallonia + variable municipal bonuses).
  • Registration duty reduction
    Reduced 3% rate on EPC A and modest housing (≤ 200 m² liveable).
  • Wallonia tax shelter
    Five-year income-tax reduction for new-build buy-to-let (€21,400 fiscal cap).
  • EPC renovation premium
    Stackable with regional aid for deep transformation — useful in evolving VEFA.
Namur Province pitfall to avoid

Karst limestone and Meuse-Sambre flood hazard.

The province sits largely on fractured limestone potentially hosting karst cavities (Condroz, Famenne, around the Citadel). In Jambes, Wépion, Dinant and Andenne, add the Meuse/Sambre flood risk. Require a G2 soil survey and check the Wallonia flood hazard mapping before signing the deed of sale — applicable to houses, buildings and subdivisions.

Témoignage acheteur
« Without the expert, I would never have spotted the bad slope of the parking. Water would have pooled. Fix done before signing. »
Portrait François Lambin, owner in Namur Province François Lambin · new-build apartment owner · Namur
From purchase to reception

Buying new-build in Namur? We support you on reception day.

Our reception expert service covers the whole Namur Province, houses and apartments. See the Namur reception expert page →