Article info · Buy new-build
Single-storey new-build house in Belgium: advantages and costs
The single-storey house combines comfort, accessibility and durability of use.
1. Advantages
No stairs, accessibility for reduced mobility, child safety. See 100 m² new-build house.
2. Land constraints
Larger ground footprint. See buying a new-build house.
3. Local market
Questions on the single-storey house
Additional cost of single-storey vs floored?
Structural work costs 10-15% more for the same surface (more extensive foundations and roof), but avoids the staircase.
What plot for a 120 m² single-storey?
Minimum 500 m² comfortably, ideally 600-700 m² for a good layout with garden.