Article info · Construction guarantees

Ten-year liability of the architect in Belgium

photo auteur
By Edouard Hennin, Provisional reception expert
Published on 27 May 2026 Updated on 27 May 2026 7 min read

The architect engages their ten-year liability on the same basis as the contractor. Their design and supervision mission involves specific risks.

1. Scope of liability

Defects in design (erroneous plans, unsuitable technical choices), defects in supervision (insufficient site monitoring). See ten-year liability.

2. Mandatory insurance

Since 2017, every architect practising in Belgium must take out ten-year insurance. Certificate to be requested before the mission.

3. Joint liability with the contractor

If the defect has a mixed cause (poor design AND defective execution), liability in solidum. The buyer can act against either one.

Expert assessment of defect origin.

Common questions

Is the architect jointly liable?
Yes with the contractor if the defect has a mixed cause (design + execution).
How to check their insurance?
Certificate to be requested before signing, verifiable via Assuralia.

Defect attributable to the architect?

Our expertise qualifies the origin of the defect and identifies the responsible party.