Construction defect · Defects & construction flaws

MVHR defects: noise, flow rate, balancing in new-builds

Severity Moderate
Reporting deadline 90 days
Warranty Two-year
Responsibility Installer

How to detect an MVHR defect?

A compliant MVHR (Mechanical Ventilation with Heat Recovery) must be silent in bedrooms (< 30 dB at night), deliver the regulated flow rates (Belgian EPC: 25 m³/h at bathroom, WC, kitchen extraction vents depending on volumes), be balanced between extraction and supply for double-flow models, with no annoying draft at the vents. Test: calibrated app sound level meter at supply vents in bedrooms, anemometer at extraction vents (kitchen, bathroom, WC), door-opening test (the MVHR should not slam the door due to excessive depression). Demand the commissioning report with measured flow rates vent by vent.

Before — compliant
silent MVHR 24 dB · flow 30 m³/h bathroom
Balanced · commissioning signed · silent in bedroom
⚠ After — defective
bedroom vent 38 dB · kitchen flow 12 m³/h
Noisy · low flow · adjust under warranty

Reporting procedure in 4 steps

A misadjusted MVHR is reported like any equipment. The two-year warranty covers equipment, the ten-year liability covers consequences (damp, mould).

  1. 1
    Measure flow and noise
    Digital anemometer at extraction vents (air speed x section). Calibrated app sound level meter 1 m from supply vents. Note time (day/night) and mode (boost or normal).
  2. 2
    Demand commissioning report
    The MVHR commissioning report must include measured flow vent by vent, static pressure, balancing. Without this document, EPC compliance is challengeable.
  3. 3
    Formal notice
    Registered letter to the installer and contractor within 90 days. Attach measurements, commissioning report (or its absence), regional EPC references (W, B, F).
  4. 4
    Ventilation expert assessment
    Independent thermal engineer with ventilation kit (anemometer, sound meter, balometer). Admissible report · from €380 VAT incl.

Who pays for the adjustment? Responsibility table

The ventilation installer is responsible. The main contractor is jointly liable for the EPC calculation.

Defect type
Contractor
Owner
Insurance
Noisy MVHR in bedroom
✓ two-year warranty
—
—
Low flow bathroom/WC/kitchen
✓ two-year warranty
—
—
Faulty balancing
✓ two-year warranty
—
—
Condensation from low flow
✓ ten-year liability
—
—
Clogged filters (post-1 year)
—
✓ maintenance
—
Get an inspection
Independent ventilation diagnosis
Flow and noise measurements · admissible report · €380 VAT incl.
FAQ

Common questions about MVHR

My MVHR whistles in a bedroom. What should I do?
Often a badly adjusted vent (excessive flow) or a pinched/crushed duct. Covered by the two-year warranty. Demand adjustment and duct inspection. If duct damaged, heavier intervention (suspended ceiling).
What is the minimum flow for my bathroom?
Under regional EPC: minimum 25 m³/h at nominal flow, 50 m³/h in boost mode. If you measure less than 20 m³/h at nominal, reportable defect. Digital anemometer essential for the measurement.
My double-flow MVHR is noisier than expected. Normal?
Noise level at the unit must be < 35 dB (boiler/utility room), at bedroom supply vents < 25 dB at night. Beyond: acoustic absorption defect or poorly insulated unit. Two-year warranty.
I am missing the MVHR commissioning report. Important?
Very important — request by registered letter. This document certifies EPC compliance and triggers the warranty. Without commissioning, you can demand the free check or obtain one at recoverable cost.
How much does a full ventilation diagnosis cost?
Between €380 and €550 VAT incl. Includes: flow measurements vent by vent with anemometer, sound level, double-flow balancing check, duct tightness test. Recoverable if defect confirmed.

Noisy or misadjusted MVHR in your new-build?

A ventilation expert measures flows, noise, balancing and produces an admissible report within 5 days. Formal-notice template included. From €380 VAT incl.