Service · Services

Ventilation inspection: flow, humidity and EPC compliance

Independent diagnosis of your ventilation: extract-only, heat-recovery (MVHR), natural or hybrid ventilation. Flow measurement at vents, humidity control, EPC logbook check and regulatory compliance. Enforceable report within 7 days to activate ten-year liability, EPC or recourse.

280 €
from · VAT incl.
1-2 h
on site
7 days
report delivered
Wallonia
+ Brussels
expert measuring the flow of an extraction vent with an anemometer
For whom

A ventilation inspection tailored to four situations.

01

New-build owner

Noisy ventilation, insufficient flows, persistent condensation, EPC complaints after reception. Ten-year or perfect-completion qualification and recourse preparation.

02

Renovation owner

Recent MVHR installation that does not deliver. Workmanship diagnosis, vent measurements and independent technical arbitration.

03

Pre-purchase buyer

Old or suspect ventilation during a viewing. Opinion to estimate recommissioning or replacement cost, negotiate the price or set a suspensive condition.

04

Owner in dispute

Disagreement with installer after faulty installation or EPC complaints. Drafting of an enforceable report, basis for amicable or judicial proceedings.

Our method

Five steps from survey to enforceable report.

Comprehensive audit methodology: visual check of the unit and ducts, flow measurement with an anemometer, humidity control, EPC logbook verification. Compared to current NIT-CSTC and EPC requirements.

  1. 01
    Phone briefing
    Preliminary exchange: ventilation type, installation date, complaints (noise, condensation, odours, bills). Submission of the EPC logbook and technical sheets.
  2. 02
    On-site inspection
    1-2 hour visit with check of the unit, filters, ducts and vents. Flow measurement at each vent with an anemometer, humidity control.
  3. 03
    Differential diagnosis
    Qualification: undersizing, installation defect, crushed or poorly connected ducts, fouled filters, failing balancing, EPC non-compliance. Ranking.
  4. 04
    Report drafting
    15-25 page document with HD photos, flow readings, legal qualification, NIT-CSTC and EPC references, and quantified rework recommendations.
  5. 05
    Recourse follow-up if needed
    Letter templates to the installer, home insurer, ten-year liability insurer or EPC certifier. Coordination with your lawyer if legal action.
Deliverables

What you walk away with, concretely.

15-25 p. enforceable report
Structured document with HD photos, flow readings, legal qualification. Enforceable in insurance, conciliation or first-instance court.
Flow table
Actual measurements vent by vent compared to NIT-CSTC requirements and the EPC logbook. Centrepiece of the recourse file.
HD geolocated photos
Photo report of the unit, ducts, vents and watch-out points. Annexed to the report and usable in proceedings.
Quantified estimate
Estimated cost of rework: balancing, vent replacement, duct rework, unit replacement. Costing basis for insurance or recourse.
Letter templates
Tailored template letters: installer, home insurance, ten-year liability or EPC certifier depending on the origin identified.
30-min briefing included
Half-hour call to review the report, prioritise actions and lock in the rework or recourse strategy.
Pricing · VAT incl., all-inclusive

Three packages for your need.

Flash diagnosis
From 280 €
Visit + written opinion · 1h on site
  • 1h inspection
  • 3-5 page written opinion
  • Flow measurement at key vents
Inspection + recourse
From 780 €
Inspection + legal file
  • Everything in 'Full inspection'
  • Legal file preparation
  • Coordination with your lawyer
  • On-site rework follow-up
FAQ

Your questions about the ventilation inspection.

What is the minimum flow at an extraction vent?
Per EPC and NIT-CSTC requirements, 25 m³/h in WC, 50 m³/h in bathroom, 75 m³/h in kitchen (excluding hood). A lower flow reveals an installation defect, undersizing or fouling.
Does failing ventilation fall under ten-year liability?
Yes if it compromises the salubrity of the property (chronic condensation, mould, degraded air quality) and appears within 10 years of reception. The expert report with measurements is the centrepiece of the recourse.
Why does condensation persist despite ventilation?
Three main causes: insufficient flow (measurement with anemometer), blocked or crushed duct, or installation defect (poor balancing of air inlets and outlets). A diagnosis clearly identifies which dominates.
Can a single-flow ventilation replace a heat-recovery unit?
No for a new build subject to the EPC. The EPC logbook imposes a specific system type. Modifying the system after reception without a study causes EPC non-compliance and blocks certification.
Should a ventilation system be serviced every year?
Yes. Vent cleaning, filter replacement (heat-recovery), duct check. Lack of servicing causes 30-50% efficiency loss within 2-3 years and may be raised in case of a claim.
Are you independent from installers and brands?
Strictly. We refuse any case where we have a commercial relationship with the contractor, manufacturer or opposing expert. Our mandate comes exclusively from the owner.

Noisy ventilation, condensation, doubt about the flow?

Failing ventilation means degraded air quality and a compromised EPC. Request a diagnosis — we come back to you during the day.