Buyer's guide · new-build market · Hainaut

Buying a new-build apartment in Fleurus: market, prices, districts (2026)

Hard data on the new-build apartment market in Fleurus, districts where it pays to invest, active developers, local tax specifics and pitfalls at reception.

Sources: Statbel · Belgian Notaries · IWEPS · Q4 2024 data updated 05/2026
Fleurus market snapshot
2 250 €/m²
Average new-build apartment price · Q4 2024
3-year change
+10%
Average absorption
12 months
New-build stock
260 units
3-year price trend

New-build apartment €/m² in Fleurus rose +10% since 2022.

A satellite of Charleroi, Fleurus benefits from proximity to BSCA airport and the Heppignies-Gosselies activity zone. New-build prices remain accessible, attracting first-time buyers and buy-to-let investors linked to the airport site.

€/m² · new-build apartment · Fleurus
2 045 €
2 140 €
2 210 €
2 250 €
2 320 €
2022
2023
2024
2025
2026 e.
Quartiers recommandés

Où acheter du neuf à Fleurus en 2026 ? Notre lecture.

Fleurus centre

Fleurus-Centre

Premium
€2,380/m²
Commercial and administrative core. Recent new-build programmes.
Heppignies Fleurus

Heppignies

Connected
€2,180/m²
BSCA airport zone. Tertiary-logistics rental demand.
Lambusart Fleurus

Lambusart

Emerging
€2,050/m²
Quiet accessible section. Modest emerging new-build projects.
Wanfercée-Baulet

Wanfercée-Baulet

Residential
€2,240/m²
Residential section, parks, schools. First-time-buyer families.
Active developers

The 6 developers delivering new-build in Fleurus in 2026.

Non-exhaustive list · factual information · we have no commercial ties with these players (deliberately so: our independence is our trade).

Developer
Flagship project
Type
Delivery
Developer Fleurus Promotion
Flagship project Résidence du Centre
Type 26 apts
Delivery 2026-Q4
Developer Hainaut Construct
Flagship project Heppignies Park
Type 34 apts
Delivery 2026-Q3
Developer Sambre Habitat
Flagship project Lambusart Riverside
Type 18 apts
Delivery 2027-Q1
Developer Carolo Bâti
Flagship project Wanfercée Jardin
Type 22 apts
Delivery 2026-Q4
Developer Pays Noir Immo
Flagship project Project Fleurus Sud
Type 16 apts
Delivery 2026-Q3
Developer Wallonia Build
Flagship project Résidence Saint-Victor
Type 20 apts
Delivery 2027-Q2
Local taxation

Fleurus-specific premiums and incentives.

  • Walloon energy premium
    Up to €2,000 for heat pump + roof insulation (stackable with municipal aid).
  • Registration duty reduction
    Reduced 3% rate for EPC A and modest dwelling (≤ 200 m² habitable).
  • Wallonia tax shelter
    5-year income-tax reduction for new-build buy-to-let (€21,400 fiscal cap).
  • Wallonia renovation premium
    Stackable with regional aid for deep renovations — for VEFA conversions.
Fleurus pitfall to avoid

Aircraft noise and the BSCA protection zone.

Heppignies and Wangenies sit under BSCA flight corridors. Beyond acoustic comfort, some plots are in easement zones. Check the acoustic attestation and the compliance of sound insulation at the reception record (glazing, façades, roofs).

Témoignage acheteur
« The expert checked the sound insulation — non-compliant glazing, redone by the developer before the final signing. »
Portrait Pierre Lardinois, off-plan buyer in Fleurus Pierre Lardinois · off-plan buyer · Fleurus
From purchase to reception

Buying in Fleurus?

Our reception expert service covers the entire Hainaut province. See the Fleurus reception expert page →