Local service · Namur Province · postcode 5000

Provisional reception expert in Namur

Are you building or buying new in Namur or in Namur Province? Our real estate expert comes to you for the provisional reception. 28 sites already covered in Namur since 2023.

Open interactive map →
Base d'expert · Namur, Namur Province
50 km · 50 min from Wavre
JambesWépionFloreffeAndenneGembloux
Lead time
5 working days
Travel
Included
Receptions Namur
28
Distance
50 km
Local rating
5.0 / 5
Particularités Namur

Ce qu'on observe sur les chantiers à Namur.

Namur is the capital of Wallonia, at the confluence of the Sambre and Meuse rivers. The new-build market is driven by the regional institutions and an influx of administrative staff, with operations in the urban core (Quartier des Casernes, Meuse riverside) and developments on the outskirts (Jambes, Wépion, Saint-Servais). Our experts have been working there every week since 2023.

Alluvial soils
Sambre/Meuse banks · vigilance for foundations and basement waterproofing, PI study often mandatory.
Administrative capital
High concentration of active developers · delivery standards often above the Walloon average.
Citadel heritage
Citadel / Old Namur perimeter · facade, proportion and material constraints written into the permit.
Market €2,600-3,200/m²
2026 new-build price in the urban core · 5% retention on €320-420K properties, significant stakes.
Cas concret · Jan. 2026

Recent assignment in Namur: reception of a new apartment in the Quartier des Casernes.

photo new apartment · Quartier des Casernes (Namur)

T3 apartment of 88 m² in a 36-unit development in the Quartier des Casernes, delivered by a Namur developer. Our expert identified 26 reservations in 3h30, including a waterproofing defect on the loggia and an EPC non-compliance on dual-flow ventilation.

The contradictory minutes enabled the owner to withhold €7,200 until full lifting. All corrected within 6 weeks by the developer.

Client Namur
★★★★★
« The expert knew the developer, the alluvial soils of the Sambre and the Walloon Region's EPC requirements. 26 reservations, €7,200 withheld, all lifted in 6 weeks. »
FAQ Namur

Frequently asked questions in Namur

Do you operate throughout Namur province?
Yes — Namur, Gembloux, Andenne, Floreffe, Dinant, Ciney and every municipality. Travel included.
Timeframe for a reception in Namur?
5 working days as standard. In high season (spring/autumn), allow 10 days. No weekend surcharge.
Are you familiar with Namur developers?
Yes — we work with the main developers active in the Quartier des Casernes, the Meuse riverside and the outskirts. Local library built up.
Sambre/Meuse alluvial soils?
We systematically check the PI study and basement waterproofing for every new property by a watercourse. Included in the service.

Need an expert in Namur or in Namur Province?

Our expert intervenes within 5 working days in Namur and the whole region. Travel included, fixed quote within 24 h.