Article info · Final reception
EPC at final reception: what you must verify
The EPC (energy performance certificate) must be validated by a final certificate before the final reception. Without it, the builder remains liable for any deviations.
1. Regulatory framework
Regional regulations (Wallonia, Brussels, Flanders). See EPC new construction for details.
2. Documents to require
End-of-works EPC certificate, final declaration, certificates of installation of insulation materials.
3. Non-conformity
A gap between the initial study and the final certificate triggers financial penalties charged to the builder. Raise reservations at final reception if the final EPC is not compliant.
Common questions
Who carries out the EPC check?
An accredited EPC certifier, separate from the builder.
What to do in case of non-conformity?
Refuse the final reception and require corrective works at the builder's cost.