Service · Services

Cracks inspection: structural or cosmetic?

Independent diagnosis of cracks in your home: structural or cosmetic qualification, root-cause identification, treatment recommendations and ten-year liability activation if needed. Enforceable report within 7 days, usable in insurance, conciliation or court.

280 €
from · VAT incl.
1-2 h
on site
7 days
report delivered
Wallonia
+ Brussels
expert measuring a wall crack with a crackmeter
For whom

An inspection calibrated for four situations.

01

New-build owner

Cracks appeared 1 to 10 years after reception. Qualification under short or long ten-year liability, responsibility identification and recourse preparation.

02

Renovation owner

Cracks appeared during or after works. Root-cause diagnosis (structural movement, vibrations, drought) and coordination with the contractor or architect.

03

Pre-purchase buyer

You spot cracks during a viewing. We provide a rapid opinion to adjust the purchase price or negotiate a suspensive condition.

04

Owner in dispute

You are already at odds with your contractor, insurer or neighbour. We draft an enforceable report, basis for amicable or court proceedings.

Our method

Five steps from diagnosis to enforceable report.

Reproducible methodology tailored to each pathology. We rigorously distinguish active, passive, structural and cosmetic cracks to correctly qualify risk and recourse.

  1. 01
    Phone briefing
    Preliminary exchange to understand the history: appearance date, evolution, works context. Request for photos and technical documents.
  2. 02
    On-site inspection
    1-2 hour visit with crack measurement (width, depth, length), evolution clue mapping and possible installation of monitoring gauges (adhesive crackmeters).
  3. 03
    Differential diagnosis
    Structural or cosmetic qualification. Identification of likely causes: settlement, shrinkage, clay drought, vibrations, workmanship defect. Risk assessment.
  4. 04
    Report drafting
    15-25 page document with located HD photos, detailed measurements, legal qualification, regulatory references and quantified treatment recommendations.
  5. 05
    Recourse follow-up if needed
    Letter templates to the contractor, insurer or neighbour. Coordination with your lawyer if legal action. Monitoring of crackmeters over 3 to 12 months.
Deliverables

What you walk away with, concretely.

15-25 p. enforceable report
Structured document with HD photos, measurements, legal qualification and recommendations. Enforceable in insurance, conciliation or first-instance court.
Cracks mapping
Floor plan with precise location of each crack, its orientation, width and qualification. Centrepiece of the recourse file.
Monitoring gauges installed
Adhesive crackmeters placed on suspect cracks to monitor their evolution over time. Readings over 3 to 12 months depending on context.
Quantified estimate
Estimate of the repair cost, from temporary to definitive. Costing basis for insurance, ten-year liability or amicable negotiation.
Letter templates
Template letters tailored to your situation: contractor, home insurance, ten-year liability, syndic or neighbour depending on the origin identified.
30-min briefing included
Half-hour call to review the report with you, prioritise actions and lock in the recourse strategy suited to your situation.
Pricing · VAT incl., all-inclusive

Three packages for your need.

Flash diagnosis
From 280 €
Visit + written opinion · 1h on site
  • 1h inspection
  • 3-5 page written opinion
  • Cosmetic/structural qualification
Inspection + recourse
From 780 €
Inspection + legal file
  • Everything in 'Full inspection'
  • Legal file preparation
  • Coordination with your lawyer
  • 12-month crackmeter monitoring
FAQ

Your questions about the cracks inspection.

How to tell a structural crack from a cosmetic one?
A structural crack is generally over 2 mm, crosses several load-bearing elements, follows a diagonal or staircase orientation. A cosmetic crack is thin, superficial, limited to plaster or a partition wall.
When to activate ten-year liability for a crack?
Long ten-year liability (10 years) covers defects compromising the solidity or destination of the property. A wide structural crack can fall under it if it appears within 10 years. The expert report is the centrepiece.
How long before I get a report?
Seven working days after inspection. In emergencies (imminent proceedings, blocked sale), we can deliver a written opinion within 48h, at an increased rate.
Are you independent from insurers and contractors?
Strictly. We refuse any case where we have a commercial relationship with the contractor, insurer or expert appointed by them. Our mandate comes exclusively from the owner.
Are monitoring gauges reliable?
Yes, for tracking crack evolution over several months. Adhesive crackmeters graduated to a tenth of a millimetre distinguish a stabilised crack from an active evolving one.
Does my home insurance cover your fees?
Sometimes yes under legal protection cover, after acceptance of the file. We supply quotes and descriptions compatible with their reimbursement procedures.

Have you seen a suspect crack appear?

The longer you wait, the harder qualification becomes. Request a diagnosis — we come back to you during the day with an inspection slot.