Service · Services

Plumbing inspection: network, sealing and drainage

Independent diagnosis of your plumbing installation: hot and cold water distribution network, sealing, pressure, drainage, hot water cylinder or instantaneous production, NIT-CSTC compliance. Enforceable report within 7 days to activate ten-year liability, perfect completion, water damage claim or recourse.

380 €
from · VAT incl.
2 h
on site
7 days
report delivered
Wallonia
+ Brussels
expert checking a water distribution manifold with a pressure gauge
For whom

A plumbing inspection tailored to four situations.

01

New-build owner

Leaks, drainage defects, insufficient pressure or failing hot water after reception. Ten-year or perfect-completion qualification and recourse preparation.

02

Renovation owner

Installation renovated by a plumber and causing trouble. Workmanship diagnosis, section check and independent technical arbitration.

03

Pre-purchase buyer

Aged or suspect plumbing during a viewing. Opinion to estimate renovation cost, negotiate the price or set a suspensive condition.

04

Owner in dispute

Disagreement with plumber after a defect or water damage. Drafting of an enforceable report, basis for amicable or judicial proceedings with insurer or contractor.

Our method

Five steps from survey to enforceable report.

Comprehensive audit methodology: visual check, pressure measurement, section and material verification, drainage check, flow test. Compared to NIT-CSTC and the current regulatory framework.

  1. 01
    Phone briefing
    Preliminary exchange: installation type, age, complaints (leaks, pressure, slow drainage, hot water). Submission of plans and invoices. Claim history.
  2. 02
    On-site inspection
    2-hour visit with check of the manifold, sections, pressure, meter and possible leaks, drainage (water test), hot water cylinder or instantaneous production.
  3. 03
    Differential diagnosis
    Qualification: installation defect, undersizing, material defect, drainage defect, ageing. Ranking and identification of responsibilities.
  4. 04
    Report drafting
    15-25 page document with HD photos, measurements, legal qualification, NIT-CSTC references and quantified rework recommendations.
  5. 05
    Recourse follow-up if needed
    Letter templates to the plumber, home insurer, ten-year liability insurer or syndic. Coordination with your lawyer if legal action.
Deliverables

What you walk away with, concretely.

15-25 p. enforceable report
Structured document with HD photos, measurements, legal qualification and recommendations. Enforceable in insurance, conciliation or first-instance court.
Network schematic
Annotated plan of the distribution and drainage network with defect locations. Centrepiece of the recourse file.
Pressure and flow surveys
Table of actual measurements compared to NIT-CSTC requirements. Clear identification of undersizing or overpressure.
Quantified estimate
Estimated cost of rework: local rework, partial renovation, full redesign. Costing basis for insurance or recourse.
Letter templates
Tailored template letters: plumber, home insurance, ten-year liability or syndic depending on the origin identified and claim concerned.
30-min briefing included
Half-hour call to review the report, prioritise actions and lock in the rework or recourse strategy.
Pricing · VAT incl., all-inclusive

Three packages for your need.

Flash diagnosis
From 380 €
Visit + written opinion · 1h30 on site
  • 1h30 inspection
  • 3-5 page written opinion
  • Main defect qualification
Inspection + recourse
From 880 €
Inspection + legal file
  • Everything in 'Full inspection'
  • Legal file preparation
  • Coordination with your lawyer
  • Water damage claim follow-up
FAQ

Your questions about the plumbing inspection.

Does a leak after reception fall under ten-year liability?
Yes if it compromises the use of the property and appears within 10 years of reception. The expert report qualifying the workmanship defect is the centrepiece of the recourse, especially for embedded leaks that are costly to uncover.
What is the normal pressure of a domestic network?
Between 3 and 5 bar static. Above that, a pressure reducer is mandatory. Below 2 bar, comfort is insufficient. The cause may be undersizing, fouling or a hidden leak.
Are old lead pipes still legal?
Their presence is not illegal in existing housing, but is strongly discouraged because they release lead into drinking water. Replacement is mandatory for heavy renovations and strongly recommended on sale.
How to detect a hidden leak without breaking walls?
Via acoustic listening, nitrogen test or thermal camera. An embedded leak may cause an overconsumption of several m³/month. A diagnosis locates the zone without systematic demolition.
How much does a full plumbing redesign cost?
From €4,500 for a studio to €25,000 for a large house. Our report provides a precise quantified estimate per item, usable in insurance or before a court.
Are you independent from plumbers and manufacturers?
Strictly. We refuse any case where we have a commercial relationship with the contractor, manufacturer or opposing expert. Our mandate comes exclusively from the owner.

Leak, low pressure or doubt about the plumbing?

Failing plumbing damages the building quickly. Request a diagnosis — we come back to you during the day with an inspection slot.