Service · Services

Electrical installation inspection: compliance and safety

Independent diagnosis of your electrical installation: compliance with the General Regulations on Electrical Installations (RGIE), safety, sizing, counter-expertise of certified body reports. Enforceable report within 7 days to activate ten-year liability, file a claim or contest a non-compliance report.

380 €
from · VAT incl.
2 h
on site
7 days
report delivered
Wallonia
+ Brussels
expert checking an electrical panel with multimeter and single-line plan
For whom

An electrical inspection tailored to four situations.

01

New-build owner

Persistent non-conformities after reception. Defect qualification against the RGIE, identification of the responsible party and recourse preparation under ten-year liability or perfect completion.

02

Renovation owner

Installation renovated by an electrician and causing trouble. Workmanship diagnosis, sizing verification and technical arbitration.

03

Pre-purchase buyer

Suspect installation during a viewing, non-compliance report older than 25 years. Opinion to estimate compliance upgrade cost and negotiate the price.

04

Owner in dispute

Contestation of a certified-body report or disagreement with an electrician. Drafting of an enforceable report, basis for amicable or judicial proceedings.

Our method

Five steps from survey to enforceable report.

Comprehensive audit methodology compliant with the current RGIE. Verification of the panel, sections, differential protections, equipotential bondings and circuits. Counter-expertise of certified body reports possible.

  1. 01
    Phone briefing
    Preliminary exchange: installation age, last control report, claims filed, recent works. Submission of single-line plans and the latest body report.
  2. 02
    On-site inspection
    2-hour visit with check of the panel, sections, protections, earthing, equipotential bondings and exposed circuits (kitchen, bathroom, outdoor sockets).
  3. 03
    Differential diagnosis
    Non-compliance qualification: protection defect, undersizing, earthing defect, missing equipotential bonding, aged devices. Risk ranking.
  4. 04
    Report drafting
    15-25 page document with located HD photos, RGIE references article by article, legal qualification and quantified compliance recommendations.
  5. 05
    Recourse follow-up if needed
    Letter templates to the electrician, home insurer, certified body or in contestation of a report. Coordination with your lawyer if legal action.
Deliverables

What you walk away with, concretely.

15-25 p. enforceable report
Structured document with HD photos, RGIE references and legal qualification. Enforceable in insurance, conciliation or first-instance court.
Non-compliance table
Detailed inventory article by article of the RGIE, with severity level and recommended compliance deadline. Centrepiece of the file.
HD geolocated photos
Detailed photo report of the panel, exposed circuits and watch-out points. Annexed to the report and usable in proceedings.
Quantified estimate
Estimated compliance upgrade cost, from regulatory minimum to full renovation. Costing basis for insurance, ten-year liability or amicable negotiation.
Letter templates
Tailored template letters: electrician, home insurance, ten-year liability, certified body in report contestation. Depending on the origin identified.
30-min briefing included
Half-hour call to review the report with you, prioritise actions and lock in the compliance or recourse strategy.
Pricing · VAT incl., all-inclusive

Three packages for your need.

Flash diagnosis
From 380 €
Visit + written opinion · 1h30 on site
  • 1h30 inspection
  • 3-5 page written opinion
  • Main panel compliance
Inspection + recourse
From 880 €
Inspection + legal file
  • Everything in 'Full inspection'
  • Legal file preparation
  • Coordination with your lawyer
  • Certified body report contestation
FAQ

Your questions about the electrical inspection.

Must my installation be compliant with the current RGIE?
An existing installation must comply with the RGIE in force at the time of installation. Full compliance upgrade is only mandatory in case of sale or significant modification. An audit clearly identifies what falls under obligation versus advice.
Can a certified body report be contested?
Yes. A certified body report does not carry the force of a court ruling. A detailed counter-expertise report allows you to request a new visit or to take the matter to court in case of dispute with the body.
Does a major non-compliance fall under ten-year liability?
Yes, if it compromises the property's safety and appears within 10 years of reception. The expert report qualifying the workmanship defect is the centrepiece of the ten-year liability recourse.
How much does a full compliance upgrade cost?
From €3,000 for a simple panel to €25,000 for a total renovation (sections, circuits, earth). Our report provides a precise quantified estimate, usable in insurance or before a court.
What documents to prepare before the visit?
Last certified body report, single-line plans, electrician invoices, ten-year liability certificate, home insurance contract. The better documented the file, the more precise the diagnosis.
Are you independent from electricians and certified bodies?
Strictly. We refuse any case where we have a commercial relationship with the contractor, body or opposing expert. Our mandate comes exclusively from the owner.

Doubt about the compliance of your installation?

A non-compliant installation is a safety risk and a sales blocker. Request an audit — we come back to you during the day.