Service · Services

Insulation inspection: thermal camera and EPC

Independent diagnosis of your home insulation: thermal camera, EPC audit, thermal bridge mapping, compliance with current requirements. Inspection of roof, facades, floors, windows and connections. Enforceable report within 7 days to activate ten-year liability, EPC claim or recourse against the contractor.

380 €
from · VAT incl.
2 h
on site
7 days
report delivered
Wallonia
+ Brussels
expert using a thermal camera to locate thermal bridges on a facade
For whom

An insulation inspection tailored to four situations.

01

New-build owner

Thermal discomfort, excessive energy bills, sense of poor insulation after reception. Ten-year or EPC qualification and recourse against the contractor.

02

Renovation owner

Recent roof or ETI insulation that does not deliver. Workmanship diagnosis, thermal camera mapping and independent technical arbitration.

03

Pre-purchase buyer

Suspect EPC or aged installation during a viewing. Opinion to estimate the actual energy class and improvement cost. Possible purchase price negotiation.

04

Owner in dispute

Disagreement with contractor after insulation defect or unmet EPC promises. Drafting of an enforceable report, basis for proceedings.

Our method

Five steps from survey to enforceable report.

Comprehensive audit methodology: visual inspection, thermal camera check in cold conditions, thermal bridge mapping, comparison to EPC requirements. Compliant with NIT-CSTC and the current regulatory framework.

  1. 01
    Phone briefing
    Preliminary exchange: construction date, insulation type, latest EPC, complaints (cold walls, condensation, excessive bills). Submission of plans and certificates.
  2. 02
    On-site inspection
    2-hour visit with full visual inspection and thermal camera pass in favourable conditions (sufficient temperature delta). HD photos and thermograms.
  3. 03
    Differential diagnosis
    Qualification: insulation defect, workmanship defect, thermal bridge, airtightness defect, ageing. Compared to EPC and NIT-CSTC requirements.
  4. 04
    Report drafting
    15-25 page document with HD photos, annotated thermograms, legal qualification, EPC references and quantified rework or improvement recommendations.
  5. 05
    Recourse follow-up if needed
    Letter templates to the contractor, home insurer, ten-year liability insurer or design office. Coordination with your lawyer if legal action.
Deliverables

What you walk away with, concretely.

15-25 p. enforceable report
Structured document with HD photos, thermograms, legal qualification. Enforceable in insurance, conciliation or first-instance court.
Annotated thermograms
Complete thermographic report with thermal bridge and air leak locations. Centrepiece of the recourse file.
Defects mapping
Annotated plan with precise location of insulation defects, thermal bridges and cold zones. Annexed to the report and usable in proceedings.
Quantified estimate
Estimated cost of rework or improvements: roof insulation, ETI, airtightness, thermal bridge treatment. Costing basis for insurance or recourse.
Letter templates
Tailored template letters: contractor, architect, home insurance, ten-year liability. Depending on the origin identified.
30-min briefing included
Half-hour call to review the report, prioritise actions and lock in the rework or recourse strategy.
Pricing · VAT incl., all-inclusive

Three packages for your need.

Flash diagnosis
From 380 €
Visit + written opinion · 1h30 on site
  • 1h30 inspection
  • 3-5 page written opinion
  • Thermal camera on key zones
Inspection + recourse
From 880 €
Inspection + legal file
  • Everything in 'Full inspection'
  • Legal file preparation
  • Coordination with your lawyer
  • 12-month energy bill follow-up
FAQ

Your questions about the insulation inspection.

Does a thermal camera work all year?
No. A thermogram requires an indoor/outdoor temperature gap of at least 10°C, ideally 15°C. The optimal period runs from October to April in Belgium. Outside this window the audit remains possible but subtle defects are less visible.
Does poor insulation fall under ten-year liability?
Yes if it compromises the destination of the property (EPC much lower than promised, major thermal discomfort) and appears within 10 years of reception. The thermographic report is the centrepiece of the recourse.
My official EPC does not match my bills — is that normal?
A small gap is expected (the EPC is theoretical). A major gap (over 30%) reveals an insulation defect, an airtightness defect or an error in the certificate. An independent audit clarifies the origin.
What is a thermal bridge and why is it serious?
It is an area where insulation is interrupted (slab, lintel, wall-roof junction). Besides energy loss, a thermal bridge causes condensation and mould on the cold wall, eventually degrading the interior finish.
How much does an insulation rework cost?
From €30 per m² for blown-in attic insulation to €180 per m² for a full ETI. Our report provides a precise quantified estimate per item, usable in insurance or before a court.
Are you independent from insulation contractors and brands?
Strictly. We refuse any case where we have a commercial relationship with the contractor, manufacturer or opposing expert. Our mandate comes exclusively from the owner.

Thermal discomfort, excessive bills, doubt about the EPC?

A failing insulation costs every month. Request a thermographic audit — we come back to you during the day.