Provisional reception expert: full support
The independent expert who turns your provisional reception into a negotiation lever: upstream preparation, 3-4 hour contradictory inspection with a 147-point checklist, minutes signed on site and follow-up of reservations until final reception. One point of contact, zero blind spot.
A service for four receiver profiles.
Turnkey buyer
Breyne Law applies. We audit the contract before signing and support you contradictorily on the day with a calibrated 147-point checklist.
Private client / principal
You coordinated architect and contractors. We adapt the method: no Breyne Law but lot-by-lot reception and short ten-year qualification.
Off-plan (VEFA) buyer
New apartment. Contradictory inspection of private areas, qualification of defects and coordination with the syndic for common areas.
Heavy renovation buyer
Vertical extension, subdivision or transformation. Reception adapted to the scope of works and the specific contractual clauses of the project.
Six steps from contract to lifting of reservations.
Reproducible and documented method. Every reception follows the same 147-point checklist, adapted to the property type. You know in advance what will be checked and what will go into the minutes.
- 01Upstream contract auditReading of the contract, specifications and plans. Identification of trap clauses, sensitive points specific to your file and known technical risks with this developer.
- 02Preparation 5 days before30-minute phone briefing to lock in strategy: visit order, watch-out points, contractual expectations. You arrive on the day in a position of strength.
- 03Contradictory inspection on the dayThree to four hours on site with you and the contractor. Laser measurements, thermal imaging if needed, compliance check against specifications and permit.
- 04Drafting of minutes on the spotContradictory minutes printed and signed on site by all parties. Numbered reservations, legally qualified and photographed. Two original counterparts.
- 0512-month reservations follow-upLiving Excel table shared with you. Contractor reminders if delays. Formal notices drafted in case of sustained default.
- 06Final reception steeringOne year later, second contradictory visit if the full package. Validation of actual liftings, drafting of the final minutes and supervision of the security deposit release.
What you walk away with, concretely.
Three packages calibrated to your need.
- Preparation 5 days before
- 3h contradictory inspection
- Minutes signed on the spot
- Everything in 'Simple provisional'
- Thermal camera included
- Living reservations table
- 12-month follow-up included
- Everything in 'Provisional + follow-up'
- Final reception included
- Security deposit release
- Upstream contract audit included
They ran their provisional with us.
« Thirty-two reservations identified on the day. The developer claimed everything was fine. The contradictory minutes held: all corrections done in six months. »
« The thermal camera revealed a major insulation defect invisible to the naked eye. Short ten-year liability triggered, insulation redone free by the contractor. »
« Three off-plan properties, three provisional receptions. The shared tracking table became my management tool. Unbeatable pricing compared with a law firm. »