Reception inspection: audit before signing the minutes
Full inspection before signing the reception minutes (provisional or final): audit of all trades, identification of visible defects, listing of reservations to record in the minutes. Physical presence on reception day, report delivered within 7 days. Secures your warranties and recourse.
A reception inspection tailored to four situations.
Breyne Law buyer
You buy off-plan or turnkey under the Breyne Law regime. Provisional and final reception must be prepared with an expert to correctly activate warranties.
Private principal client
You commissioned a build with a contractor outside the Breyne Law. The site reception must be documented to secure perfect completion, ten-year liability and all warranties.
New apartment buyer
You take possession of a new apartment in a building. Reception of private areas and vigilance on common areas to be mentioned in the individual minutes.
Renovation owner
You receive a heavy renovation. Trade-by-trade audit, listing of visible defects and points to be reworked before the contractors are paid in full.
Five steps from preparation to reception.
Comprehensive all-trades audit methodology adapted to the legal constraints of Belgian reception. Upstream preparation, physical presence on the day, drafting of the reservations minutes, perfect-completion follow-up.
- 01Briefing and preparationPreliminary exchange: type of contract (Breyne Law or not), contractor, scheduled date. Submission of plans, specifications, previous site minutes. Preparation of the audit checklist.
- 02On-site audit3-4 hour visit (depending on area) on reception day or the day before. All-trades audit: shell, roof, windows, electrical, heating, plumbing, ventilation, finishes.
- 03Listing of reservationsOn-site drafting of the listing of reservations to be recorded in the reception minutes. Ranking: safety, compliance, finishes. Presented to the contractor at signing.
- 04Report drafting20-35 page document with located HD photos, detailed reservations, legal qualification, NIT-CSTC references and quantified estimate of expected rework.
- 05Perfect-completion follow-upCoordination of rework during the perfect-completion period (1 year). Verification of effective lifting of reservations. Letter templates to the contractor if delay or refusal.
What you walk away with, concretely.
Three packages for your need.
- 3h audit on the day
- Reservations minutes drafted on site
- Physical reception presence
- Everything in 'Flash reception'
- 20-35 p. enforceable report
- Full room-by-room audit
- Quantified estimate
- Everything in 'Full reception'
- 12-month perfect-completion follow-up
- Partner lawyer coordination
- Formal notices included
They entrusted us with their reception.
« The contractor wanted us to sign with no reservations. The expert listed 43 defects in 3 hours. The signed minutes with reservations led to €27,000 of rework charged to the contractor. »
« Heavy renovation delivered 'finished'. The audit identified 18 points not compliant with the specifications. Rework obtained before final payment, not a euro more out of pocket. »
« New apartment in Schaerbeek. Provisional reception supervised by the expert. Reservations minutes signed in due form. Perfect completion scrupulously followed. »