Lead magnet · Free download

Breyne Law security deposit checklist: 8 points to check before signing

The complete pack our expert uses to verify your 5% security deposit certificate before the notarial deed. Printable PDF + editable Word + anonymised example of a real assignment.

✓Printable PDF
✓Editable Word
✓Annotated example
2026
Breyne Law up-to-date
Get the full pack
Download the 6 documents in one click.
preview annotated deposit certificate
Preview · 8 pages in total
What's included

Everything you need to verify your Breyne Law certificate.

  • 8-point checklist
    The 8 critical checks on every security deposit certificate before signing the notarial deed.
  • Letter template to the developer
    Pre-drafted Word document to send if the certificate shows anomalies.
  • Anonymised example
    A real certificate annotated by our expert, with green/orange/red comments.
  • Guarantor banks table
    List of the main guarantor banks in Belgium with their BIC codes.
  • Excl. VAT vs. incl. VAT calculation
    Excel sheet with worked examples by property type.
  • 12-page legal guide
    Article 12 Breyne Law explained clearly with recent case law.
How to use it

Three steps to secure your turnkey purchase.

01

Before signing · 5 minutes

Download the pack, print the 8-point checklist and the annotated example. Get your draft notarial deed and the deposit certificate from your developer. Methodically check the 8 points with your pen: issuing bank, certificate number, calculation basis (excl. or incl. VAT), exact amount (5% of the excl.-VAT price in 99% of cases), issue date, validity period, release conditions, signatures. This step takes 5 minutes but can avoid thousands of euros in disputes.

02

If an anomaly is detected

Sign NOTHING. Open the letter template to the developer (Word), fill in your identity, the property address, and tick the non-compliant items. Print two copies, sign, send by registered mail with acknowledgement of receipt. Most developers correct within 5 to 10 working days (they know that the contract is null and void by operation of law without a valid certificate, Article 12 Breyne Law).

03

On the day of the notarial deed

Bring the completed checklist to the notary. Compare with the original certificate. Refuse to sign if an anomaly remains — it is your last chance to act before 12 months of warranty. If everything is compliant: sign knowing that you have fulfilled your duty of care. Keep the signed checklist and a copy of the certificate in your file.

Breyne security deposit checklist pack

Receive the 6 documents in one email.

Download now